{"id":2983,"date":"2026-02-08T07:50:25","date_gmt":"2026-02-08T04:20:25","guid":{"rendered":"https:\/\/omqo.com\/project\/construction-of-the-second-runway-of-the-dolat-abad-torbat-heydariyeh-highway\/"},"modified":"2026-07-16T14:11:24","modified_gmt":"2026-07-16T10:41:24","slug":"construction-of-the-second-runway-of-the-dolat-abad-torbat-heydariyeh-highway","status":"publish","type":"project","link":"https:\/\/omqo.com\/en\/project\/construction-of-the-second-runway-of-the-dolat-abad-torbat-heydariyeh-highway\/","title":{"rendered":"Construction of the second runway of the Dolat Abad &#8211; Torbat Heydariyeh highway"},"content":{"rendered":"<p>Construction of the second runway of the Dolat Abad &#8211; Torbat Heydariyeh highway, distance from km 000+0 to 400+24<\/p>\n","protected":false},"featured_media":2982,"parent":0,"template":"","project_taxonomy":[120,125],"class_list":["post-2983","project","type-project","status-publish","has-post-thumbnail","hentry","project_taxonomy-omrani-projects","project_taxonomy-road"],"_links":{"self":[{"href":"https:\/\/omqo.com\/en\/wp-json\/wp\/v2\/project\/2983","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/omqo.com\/en\/wp-json\/wp\/v2\/project"}],"about":[{"href":"https:\/\/omqo.com\/en\/wp-json\/wp\/v2\/types\/project"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/omqo.com\/en\/wp-json\/wp\/v2\/media\/2982"}],"wp:attachment":[{"href":"https:\/\/omqo.com\/en\/wp-json\/wp\/v2\/media?parent=2983"}],"wp:term":[{"taxonomy":"project_taxonomy","embeddable":true,"href":"https:\/\/omqo.com\/en\/wp-json\/wp\/v2\/project_taxonomy?post=2983"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}